TC Power - Complete Gas Turbine Maintenance
TC Power

 

Used Equipment

TC Power Offices

General Electric LM1600 Combined Heat Plant

TC Power Ltd.  has a 13.7 MW LM1600 combined heat power plant for sale. The CHP for sale was manufactured by Thomassen Stewart Stevenson International and commissioned in 1993. The plant is in excellent condition with 60,275 hours of operation since new.

LM 1600 G.T. Engine

Manufacturer: General Electric

Model: 7LM1 600-PA-NDW

Approx. weight: 3023kg

LM1600 Gas Turbine Generator Set
LM1600 Gas Turbine Generator Set

Operating Hours

Time Since New About 55,000 hours
Starts Since New Unk.
HPC Hours +8000 hours
HPT Hours +25,000 hours

For full sales particulars please download the pdf.

Woodward
> Click here to contact TC Power
 
.......................................
 

For full sales particulars of the LM1600 please download the pdf.

LM1600

24 Hr Hotline +44 (0) 1652 631050 • Tel +44 (0) 1652 631000